If you have more than 2 to level out you should level out your area by removing soil from the high side first.
Leveling ground for pool with sand.
The sand creates a base protecting not only the liner of your pool but to provide a buffer against grass and weeds or any other sharp objects you may have missed in the dirt.
It then calculates an additional 2 inches of sand to place over the leveled area.
Lay out a layer of sand 1 to 2 inches 2 5 to 5 1 cm deep across the work area then roll over it with the tamper.
How to level your site for your above ground pool.
They could collapse under the weight once you fill up your pool.
Once that step is done you can begin to tamp down the sand.
The ground must be compact and firm so the pool should not be set up on mud sand or loose soil.
Do not place your pool on a deck balcony or platform.
Next take some sand and pour it over the area with the majority of the sand in the low range of the pool.
The undisturbed earth should be leveled.
If the drop is too much you can get uneven compaction of the sand leading to a swimming pool that is not level.
Swimming pool site sand calculator note that this calculator adds 3 feet to your diameter and calculates the sand to level your area.
Tips for leveling your intex above ground swimming pool area with sand if you have more than a few inches drop it is a good idea to level off the top side a bit first.
Hit a metal rod through the hole securing the boards to the ground.
Many pool manufacturers call for a layer of sand but check your owner s manual to stay on the safe side.
It s true that concrete sand is an excellent choice for creating a level surface beneath an above ground pool but the particle size of the sand may be bigger resulting in the chance for voids.
If you re still unsure of which sand you want to use for your swimming pool project we recommend speaking with a local expert such as braen supply.
After leveling the ground you need a truckload of sand.
The ground under your pool should be flat and level.
Getting sand delivered is as easy as a phone call to a landscaping supply company or your local garden center.
Add as much sand as necessary and rotate the boards until the sand is level.