You will have to make sure your joists can handle the addition of considerably more weight from the plywood subfloor and any floor coverings.
Leveling floor joists sistering.
Now that said when you have a major humpy floor you should bite the bullet and remove the subfloor planks down to the joists.
This job can run you 1 000 and 5 000 depending on the extent of the job.
Doing so strengthens weak joists and can help straighten sagging joists.
But it s usually best to run the sister joist over the entire span.
Set the joist in with s 3 4 block sitting on top and raise until the block touches the string and drive a screw right below the string remove block and set go set the other end the same way.
You will have a level sound surface to lay your new floor on.
Sistering joists means beefing them up with additional material.
Framing lumber is the typical.
The process of fixing both an out of level and an out of plane floor is simply known as leveling a floor.
How to sister a floor joist.
Lay a new 3 4 plywood subfloor and bob s your uncle.
If you have an uneven floor you may need to think about leveling floor joists with shims.
A plywood subfloor will bridge any minor waves in the existing floor and leveling compound would help too.
Since this is a repair of a faulty or damaged floor joist it is imperative to do this project correctly and there are a few big mistakes to avoid.
Sistering joists is a job for the.
Properly sistering floor joists is very important and should not be rushed to save time.
Then attach the sister joist using three 16d common nails driven every 16 in.
When the sagging joists are level apply a generous bead of construction adhesive to the existing joist.
Tie a string across the top of level 3 4 above the highest joist.
Then sister the joists will lvl joists at exactly the level you want.
Use floor glue it will stick.
Driving 16d common nails in old hard wood is difficult.